Upgrading
CoAutoResearch v2.0 separates the installed package from project data. Updating the npm package changes the CLI and package-managed server; migrating a project is a separate, explicit, backup-first operation.
Update the installed CLI and package-managed UI runtime with npm:
npm install -g co-auto-research@latest
Check the installed version:
co-auto-research version
Each generated project includes:
.co-auto-research-template/manifest.json
The manifest records the template version used to create the project.
co-auto-research upgrade reports the installed CLI version, the detected
project template version, and the npm update command.
Updating the npm package updates the CLI, dashboard, and default UI runtime used
by co-auto-research ui and co-auto-research attach. Existing project
research files are not rewritten automatically.
Preview And Apply A Project Upgrade
Stop agent runs first, create and rehearse a manifest-verified project backup, and preview the exact managed changes:
co-auto-research backup . --output ../backups/project-before-v2-upgrade
co-auto-research restore ../backups/project-before-v2-upgrade ../restore-rehearsal \
--expected-manifest-sha256 <sha256-from-backup-output>
co-auto-research upgrade-project --dry-run
co-auto-research upgrade-project
The backup contains canonical state, trials, resources, manuscript, and runtime
configuration with raw credentials removed. Restore verifies all SHA-256 values
and requires a missing or empty destination, so the rehearsal cannot overwrite
the source project. Start the restored project once with co-auto-research attach ../restore-rehearsal, inspect its Research Board, then remove the
rehearsal only after the upgrade has passed its canary period.
The rehearsal remains read-only until explicitly released with
co-auto-research restore-acknowledge ../restore-rehearsal --expected-manifest-sha256 <sha256> --operator <name>.
For all projects in the default dashboard folder:
co-auto-research upgrade-project --all --projects-dir co-autoresearch-projects
The command classifies the project as legacy, v2, future, or corrupt before it
writes. It refuses unsafe or ambiguous states. Managed reviewer/instruction
bytes are backed up under archive/template_migrations/. The protocol migration
uses archive/v2_migrations/<migration_id>/ for its manifest, exact before
snapshots, receipt, and ROLLBACK.md.
Migration is additive: it creates typed v2 state and metadata without deleting v1 trials, Markdown research content, reviewer history, custom instructions, or user-owned resources. Re-running a completed migration is idempotent. A v1 trial without a v2 review manifest remains available through the labeled legacy fixed-eight reviewer fallback.
After migration, canonical JSON, merge decisions, goal gates, transactions, and publish receipts are service-owned. Do not hand-edit them. The next agent run proposes one bounded trial through staging and review; only a receipt-backed transaction advances the canonical revision.
Project-data Rollback
Project-data rollback is supported only before newer v2 canonical work depends on the migrated state.
Stop the UI and every agent process for the project.
Copy the project or take a filesystem snapshot before rollback.
Confirm that no post-migration v2 trial, receipt, canonical revision, staging artifact, or transaction must be retained.
From the project directory, run:
co-auto-research upgrade-project --rollback
The rollback verifies the committed migration’s after-hashes, restores exact before bytes, removes only migration-created files, verifies the preserved v1 hashes, and retains
archive/v2_migrations/<migration_id>/as evidence.Start the UI and confirm the project is classified as legacy, the original trials/reviews/resources remain readable, and no recovery diagnostic is open.
Rollback refuses an active project, an incomplete migration, changed migration targets, or newer v2 canonical artifacts. Do not bypass that refusal by deleting receipts or transaction files. Preserve the project and recover or export the newer work first. If startup reports an interrupted migration, let deterministic recovery complete before requesting explicit rollback.
upgrade-project --rollback covers the protocol migration. If you also need to
undo a managed instruction sync, restore the recorded files from the matching
archive/template_migrations/ backup only while the project is stopped, then
run co-auto-research doctor and verify the instruction baseline. Custom files
outside the managed core set are never rollback targets.
Legacy Deliverables After Upgrade
Older Critical Path, PAPER_PLAN.md, BLUEPRINT.md, Resource Scout, and
reviewer Markdown remain readable history. In v2.0, the executable bottleneck,
findings, line/campaign state, gate, and publication truth come from validated
typed artifacts; Markdown cannot override them. Existing manuscript content is
preserved and may be updated by a later reviewed trial.
The UI now gates the Paper-Writing Pack. If the blueprint is still a stub, contains planned slots, lacks real result sources, or has blocking missing evidence, export a Research Status Pack instead. The status pack is compatible with legacy projects and is intentionally labeled as incomplete.
For the current v2 workflow, use Manuscript → Generate paper after reviewed results have been recorded and project agents are idle. The product prepares the evidence, runs its writing agent and offers a PDF for human review. Export packs remain available for inspecting or carrying research material elsewhere; they are not a prerequisite for in-product paper generation. See paper generation for setup and readiness checks.